Post #4 CREATING AN URBAN MOBILITY PLAN The issue of the redesign of the Route 81-Almond Street corridor is especially important because of its potential to strengthen the connection between downtown and the University Hill area, where the educational and medical institutions are expanding and planning further growth. These institutions will not only transform the Hill, they have... Read more »
EXTREME MAKEOVER: HIGHWAY EDITION Here are the facts: Interstate 81’s bridges are nearing the end of their useful life. The elevated freeway cutting through the city of Syracuse suffers from structural deterioration that will require the bridges to be replaced, not just repaired, within the next several years. The project, whatever... Read more »